Tuesday 3rd February was the 3rd day of filming our opening.
This was our second time filming at Brandon's house and second time filming the bedroom scene but from the footage from the previous day of filming helped us so we wouldn't make the same mistakes twice. We began filming at around 1:30pm.
We used the AS Panasonic camera again because it was much easier to use previously on set to film in close spaces. We set the lights on top of the wardrobes at the side of the room to cover the whole room, this had it's advantages and disadvantages. The lighting stayed n one place so shots wouldn't look completely different like last time but we did have to watch out for our positioning since the lights would cast shadows if you were in front of them but we worked round this with the cast and crew.
We filmed the bedroom scene and the upstairs landing scene (corridor scene on shot list). We were much more prepared with each day of filming learning from our mistakes and what we did well.
No comments:
Post a Comment