Thursday 19th of February was Day 6 of filming.
The it was raining during this day of filming which it wasn't the previous two day we were supposed to film. So I had to think of a way to make sure the work lights wouldn't get wet while outside by taping an umbrella to a crash stand so we didn't have to hold it, I also used plastic to cover the cable wheel so it wouldn't get wet.
We had finished the bedroom scene and now had to do the next scenes which were Brandon walking to the living room, the realization of someone breaking in, the rush to the utility room and the reveal of the silhouette.
We started filming at 6 and finished at 8 we filmed the living room scene and the front door scene without a problem. For the kitchen scene we just had to decide where the placements of the lights should be and everything else in the scene was complete.
The silhouette scene had a major problem which was that the shower curtain wasn't large enough to cover all of the window. This was a problem as it limited our shot types that I wanted to use to make the reveal more dramatic but couldn't making the footage lack luster.
All we need to do is redo the silhouette scenes.
No comments:
Post a Comment